Sika® Chapdur IN is a one part, preblended, coloured mineral dry shake hardener for concrete comprising of cement, specially selected natural mineral aggregates, admixtures and pigments. Sika® Chapdur IN provides a extremely hard wearing and abrasion resistant topping for monolithic floors. When sprinkled and trowelled into fresh wet concrete floors, it forms a coloured, dense and wear resistant smooth surface.
Suitable for use in all cases where floors are subjected to severe mechanical wear and there is a need to apply special hard wearing surface coverings, such as:
Chemical Base
Natural mineral aggregates graded and mixed with cement, admixtures and pigments
Shelf Life
12 months from date of production
Storage Conditions
The product must be stored in original, unopened and undamaged sealed packaging in dry conditions at temperatures between +10 °C and +30 °C
Bulk Density
1.5 ± 0.1 kg/L at +27 °C
Abrasion Resistance
~1.70 mm wear loss | (IS:1237) |
Compressive Strength
≥ 70 N/mm2 | (IS:4031 Part 6) |
Layer Thickness
2.5–3.0 mm at dosage of ~5.0 kg/m2
Ambient Air Temperature
+5 °C min. / +35 °C max.
Relative Air Humidity
30% min. / 98% max.
Substrate Temperature
+5 °C min. / +35 °C max.
Applied Product Ready for Use
Foot Traffic | Fully serviceable |
~72 hours | ~7 days |
The above values are at substrate temperature of +27 °C and dependant upon the concrete reaching its design strength for serviceability and will be affected by changing ambient conditions, particularly temperature and relative humidity.
Consumption
Application | Product | Consumption |
Light duty | Sika® Chapdur IN | 3.5–4.0 kg/m2 |
Medium duty | Sika® Chapdur IN | 4.5–5.0 kg/m2 |
Heavy duty | Sika® Chapdur IN | 5.5–6.0 kg/m2 |
SUBSTRATE QUALITY
APPLICATION
Application time for dryshake products is influenced by every variable which affects the placing of concrete, and can therefore vary substantially, depending on the prevailing conditions.
Dependent on the conditions, remove the surface bleed water or allow it to evaporate. Sprinkle Sika® Chapdur IN onto the screed concrete evenly in 2 stages, first stage 60% and second stage 40%. Care must be taken to apply the product without creating ripples etc. in the concrete surface. The first application must be worked into the slab immediately followed by application of the second stage quantity of Sika® Chapdur IN. Final finishing, closing pores and removing undulations can be achieved either by hand or powered trowel.
Please also note:
Periodical checking of the condition and development of the concrete will determine the correct time frame for each stage and sequence of application.
For mechanical application with automatic spreader and laser screed, the spreading can start almost immediately after the concrete has been levelled to allow for the hydration of the dryshake. Compaction with the trowel can start as soon as the weight of the power trowels is supported by the concrete.
For manual application, the dryshake must be spread once the concrete can be stepped on, without leaving a print deeper than 3–5 mm.
CURING TREATMENT
Cure Sika® Chapdur IN immediately after finishing using clean water. For chemical curing, please consult Sika Technical Service team.
CLEANING
To maintain the appearance of the floor after application, Sika® Chapdur IN must have all spillages removed immediately and must be regularly cleaned using rotary brush, mechanical scrubbers, scrubber dryer, high pressure washer, wash and vacuum techniques, etc., using suitable detergents and waxes.